OR & ON Power

Integrity InSitu - OR & ON Power Briefing

Integrity InSitu

Securing OR & ON Power’s
Subsurface Assets

Protecting the 230 Billion ISK CAPEX Roadmap and Global Carbfix Expansion through direct, in-situ geomechanical intelligence.

Presenter

Nicolai Gissur Ingvarsson

IIIP

The Strategic Mandate

Executive Anchor

Executing CEO Sævar Freyr Þráinsson's directive for capital efficiency within a 230 - 245 Billion ISK five-year CAPEX plan.

The Mandate

Securing new discoveries for 110,000 capital residents while protecting NIB & EIB international green financing covenants.

Subsurface Risk is Financial Risk

Financial Indicator Status / Metric Strategic Implication
Total CAPEX Deployment 230 - 245 Billion ISK Expansion of Coda Terminal, District Heating, and new drilling.
Operating Revenues (2029) 88.1 - 96.0 Billion ISK Dependent on reliable scaling of the newly tapped Meitlar discovery.
International Financing NIB & EIB Backing Strict ESG covenants demand proof against induced seismicity.

The Vulnerability: Operating in the highly dynamic Mid-Atlantic Ridge means inferred wireline correlations break down. Multi-billion ISK assets cannot be designed on proxy data.

The Asset Portfolio Playbook

I. The Meitlar Discovery

Securing the 3rd Confirmation Well

The Unknown Baseline

Meitlar is a newly tapped tectonic compartment (275°C). Relying on inferred wireline data from older Hellisheiði fields risks catastrophic casing collapse and wellbore instability during thermal cycling.

Integrity InSitu Solution

Establish a day-one physical baseline. Deploy during the 3rd confirmation well using cold-water mitigation to capture exact SHmax and UCS in-situ.

Strategic Impact:

Provides mathematical certainty to securely set casing strings and mud windows for the entire future development of the field.

II. Carbfix & Global Export

Auditor-Verifiable Integrity Proof

Foreign Geology Risks

Exporting Carbfix to Turkey and Germany introduces severe risk. Acidic CO2 injection in unfamiliar volcano-clastic/sedimentary basins fundamentally alters localized pressure, risking induced seismicity and caprock failure.

Integrity InSitu Solution

A proprietary international advantage. Instant ground-truth measurement of SHmax, Shmin, and UCS before and during injection phases.

Strategic Impact:

Satisfies strict EU regulations by physically proving injection will not exceed fracture gradients or trigger seismicity.

Technical Defense

Direct Physical Measurement vs. Probabilistic Modeling

The Physics of Failure

We bypass acoustic wireline errors by inducing physical thermal breakouts. Thermal stress magnitude is calculated as:

σ_ΔT = (E × α × ΔT) / (1 - ν)

Bridging the 275°C Gap

To handle Meitlar's 275°C+, we utilize Cold-Water Mitigation. The high-volume quenching protects our 165°C-rated tool while acting as the core physical trigger to induce the thermo-elastic stress necessary for measurement.

Integrated Infrastructure Monitoring

Moving from Tool Rentals to Data Subscriptions.

  • The Double-Play: Establish a recurring 3-year "Stress Evolution Audit" for OR's entire portfolio.
  • Carbfix Integration: Package the Insight tool as a mandatory, recurring diagnostic service for every new international Coda Terminal project.

"Wir verkaufen keine Werkzeuge, wir verkaufen Sicherheit."

(We don't sell tools, we sell certainty.)

How Do We Proceed?

Meitlar 3rd Well Confirmation Carbfix GECO Demonstration